Rear view
Entry
Kitchen
Dining
Dining
Living
Bedroom
Bedroom


Single Dwelling (Concrete)

Manly

06 / 2019

Building Structure: Single Dwelling (Full Concrete)
Construction Period: 9 months
Land Size: 237 m2
Internal Area: 211 m2
Construction Cost: $1,200,000 +
ARC Role: Interior Design & Construction

Project Highlight: Architectural Lighting Design; Smart Home Automation Control System and Mobile Security Monitoring System