FEATURED PROJECTS

2020

MOSMAN

Building Type: 4 Townhouse Development
Construction Period: TBD
Land Size: 1300 m2
Internal Area: 900 m2
Project Stage: DA Stage
ARC Role: Project Management & Construction

st marks 3

2020

RANDWICK

Building Type: 4-Storey Apartment 
Construction Period: TBD 
Land Size: 700 m2
Internal Area:  600 m2
Project Stage: DA Stage 
ARC Role: Project Management & Construction

main

2020

West pymble

ARC x Cerebral Palsy Australia

Project Type: Group Home Construction 
Construction Period: 9 months
Land Size: 930 m2
Internal Area: 310 m2 
ARC Role: Construction

2020

MOSMAN

Building Structure: Double Brick Single Dwelling
Construction Period: 3 Months 
Land Size: 660 m2
Internal Area:  330 m2
ARC Role: Alternation & Addition 

2020

NORTH RYDE

Building Structure: Brick Veneer Single Dwelling
Construction Period: Ongoing 
Land Size: 620 m2
Internal Area:  400 m2
Construction Value: $850,000+
ARC Role: Architectural Design, Interior Design & Construction

2020

Leichhardt

Building Structure: Brick & Concrete w/t cladding
Construction Period: Ongoing 
Land Size: 400 m2
Internal Area:  300 m2
Construction Value: $1,550,000+
ARC Role: Architectural Design, Interior Design & Construction

2020

BLAKEHURST

Building Structure: Double Brick with Basement
Construction Period: 18 months
Land Size: 550 m2
Internal Area: 390 m2
Construction Value: $1,700,000 +
ARC Role: CC & Construction

facade

2020

RANDWICK

Building Structure: Double Brick
Construction Period: 10 months
Land Size: 270 m2
Internal Area: 213 m2
Construction Value: $1,100,000 +
ARC Role: CC & Construction

2020

RYDE

Building Type: Six Townhouse Development
Construction Period: 11 months
Land Size: 2100 m2
Internal Area: 1100 m2
Construction Cost: $2,200,000 +
ARC Role: Project Management, DA&CC & Construction

2019

MANLY

* Sydney’s 1ST Adaptive Reuse Development

Building Structure: Full Concrete with Basement 
Construction Period: 18 months
Land Size: 2200 m2
Internal Area: 500 m2
Construction Value: $5,500,000 +
ARC Role: Project Management & Construction

2019

MANLY

Building Structure: Full Concrete
Construction Period: 9 months
Land Size: 237 m2
Internal Area: 211 m2
Construction Value: $1,200,000 +
ARC Role: Interior Design & Construction

2019

Dundas VALLEY

Building Structure: Steel Frame Duplex
Construction Period: 9 months
Land Size: 628 m2
Internal Area: 488 m2
Construction Value: $950,000 +
ARC Role: Architecture Design, Interior Design & Construction

2019

East lindfield

Building Structure: Double Brick
Construction Period: 11 months
Land Size: 990 m2
Internal Area: 500 m2
Construction Value: $1,600,000 +
ARC Role: Design & Construction

 

2019

Roseville

Building Structure: Brick Veneer 
Construction Period: 8 months
Land Size: 650 m2
Internal Area: 300 m2
Construction Value: $700,000 +
ARC Role: Design & Construction

2018

lindfield

 

Building Structure: Double Brick 
Construction Period: 12 months
Land Size: 2200 m2
Internal Area: 500 m2
Construction Value: $1,500,000 +
ARC Role: Design & Build

FEATURED DESIGN CASES

06 / 2020

Contemporary luxe living meets cutting-edge design, created for a discerning taste

02 / 2020

This textured exterior is just more than a design aesthetic

06 / 2020

Perfect equilibrium between a practical design, comfort and personality

06 / 2019

The Artisan, selective design from outside to inside

01 / 2019

Carefree luxury on the modern multi-dwelling development

10 / 2018

A rare development with tennis court and swimming pool

07 / 2018

A non-comparable home design for all those who like something a little different and a little beyond the norm

03 / 2017

A sensational design that has been artfully crafted to create a sumptuous home of surprising space and functions

05 / 2018

A home design with clean lines, a modern and luxurious use of elements and an abundance of natural light